I have been looking at the things that need to be worked on for 2009 and Building New Worlds the past week or so. Some of the things that I want to make happen this next year are easy enough and others will take some time. Time is always a factor when you have your own business. It is normally not your friend. Some of the things on the board for me to tackle for 2009 are site issues and some are opts for making things run easier in the office. Some are also to make life easier for collectors of lighted villages. Here is a look into what I hope to work on for the next year at this point.
The online store is lacking some things. I would like to see a check out on the store itself in the coming year to speed up the buying process for our customers. Right now to place your order you have to e-mail it to us and then we process it and add the shipping charges etc and then send that back for approval before the order is completed and shipped out. This takes about a day or so to do through e-mails. With a shopping cart we would cut that time. There would still be a confirmation e-mail sent out but you would already have a total and your order would by pass some of the process in place right now. I would like to update the way we handle inventory also so that the processing time is cut some also. This way the ship date would be moved up to 24 to 36 hours from ordering rather than the 2 to 3 days we now take to send out packages. I also would like to spend a little money on 2009 on Google ads and site promotion to make finding us a little easier than it is right now.
With the network I hope that we can add to the team this coming year and make it so that the time Admin are working on the network is cut in half. Right now our team is good and they do well at what they do but they spend too long working on things and not enough time just enjoying the network. I know this and I tell them how good they are all the time but that seems so little for all the work they do. I would also like to find sponsors for contest on the network. Right now our store is the only sponsor there is for those and that can be draining to foot that bill alone. If you know of any body or would like to be a sponsor yourself please contact us at Buildingnewworlds@gmai.com
Within the office there are some things that need to be worked out also but I am not going to tire you with those details as that is kind of a waist of time. I will say that once they are worked out it will make our role in the village community more effective and make us much better players in the market.
Thanks for your on going support!
Showing posts with label waterfall. Show all posts
Showing posts with label waterfall. Show all posts
Sunday, October 5, 2008
Plans for 2009
Labels:
2008,
Albany Oregon,
Building New Worlds,
collecting,
collection,
D56,
village,
villages,
villaging,
waterfall
Wednesday, May 16, 2007
Waterfall
Author: Britt
If you have any question or need more explanations please ask at the forum:
http://www.freepowerboards.com/neodreaming/index.php Village Learning Center.
I started with gluing layers of styrofoam together in the basic shape I wanted. Then I used a hobby knife to cut out the river bedding. It should not be a smooth surface, that will only make the next step more difficult. Do not cut deep unless that is the effect you want, I will fill it up. I left an empty space for electricity equipment under the base in the back in case I want to use lights together with it. A bend at the top of the riverbed makes the base easier to integrate in a landscape - the river can appear from behind rocks or trees.
I added a thin layer of air dry clay in the riverbed and made it smoother with a tool (a butter knife will work if you don't have a tool). Then I started to add the shape of the flowing water. It does not have to be very detailed or perfectly done - this is just the base for the water. Make sure the river bedding is filled at the edges. If the clay doesn't want to stick dampen the styro slightly or you may need to make the styro surface more rough.
Continue with the whole waterfall in the same way. If it is a large area you have to do the next step before the clay has dried too much.
The whole river bedding is filled and I started to add the currents in the water and the whirls- under the waterfalls and where the water is forced to change direction by rocks etc.
I painted the base around the waterfall in a basic landscape color, brown in this case. Make sure the paint is waterbased or it will melt the styrofoam. (I am using my kids poster paint from the toy shop...!) The paint will mostly be covered later but I don't want the white styro base to show.I shaped loose rocks from the clay and added them into and around the river bedding. I didn't make them very smooth, they should be irregular and have some cracks.
When everything was dry I glued the loose rocks into place and painted them very dark (black) and the water was painted blue. Do not worry about the colors, the idea is to cover the styro and clay at this stage. After a while I checked it and added more paint (made thinner with water)where the styro or clay wasn't completely covered.
The rocks were brushed with medium grey, without covering the deeper parts and then I dry brushed the areas sticking out with very light grey to highlight them.I did this to all the rocks and also made the blue water a bit darker with grey paint. It should be darker now than the final result.
My rocks have moss so I brushed the areas I wanted mossy with dark green, avoiding to add paint in the deeper areas. I also painted some darker areas in the water- those will be in the shadow of plants later.
My rocks have moss so I brushed the areas I wanted mossy with dark green, avoiding to add paint in the deeper areas. I also painted some darker areas in the water- those will be in the shadow of plants later.
I used a glossy varnish to make the rocks close to the water look shiny from moisture. I also used it to seal the paint in the river bedding before starting the next step.A glossy transparent paint thickener paste was added into the river bedding to create the effect of water. Be very careful with how this is done as this pattern of flowing water will be showing when it is finished.
The paste dries up clear, as long as it is white it still has to dry. As you can see I added a thicker layer under the waterfalls to shape foam and whirls. I decided to add another layer to get the effect I wanted in this case. It is better to apply several thinner layers than one thick.When the paste was completely dry the final step: Dry brushing the paste very lightly with white or very light grey paint.
I attached this base to the rest of my landscape using wooden sticks or tooth picks instead of gluing it - I want to be able to use it again in several displays.
Plants and scatter material was added for the finishing touch.
-
Subscribe to:
Posts (Atom)



